Three Core Elements of Screw Air Compressor Installation


Release time:

2025-08-19

Three Core Elements of Screw Air Compressor Installation

CHANUN Air Compressor 

Environment and Foundation  

Location determines equipment lifespan.The compressor room must meet three core conditions: dry, well-ventilated, and dust-free.  

Space Layout:

  - Distance between equipment and walls 1.5 meters.  

  - Spacing between multiple units in parallel 2 meters.  

  - Clearance above the equipment 4 meters to ensure unobstructed airflow for heat dissipation.  

  - If ambient temperature exceeds 40°C, industrial exhaust fans or air conditioning must be installed.  

  - For temperatures below 0°C, electric trace heating is required for pipelines to prevent freezing.  

Pollution Protection: 

  - Keep away from dusty workshops and acid-washing sections.  

  - The air intake should be at least 2 meters above the roof and equipped with a three-stage pre-filter (coarse filtration accuracy 50μm).  

  - In chemical zones, stainless steel pipelines must be used for corrosion resistance.  

Ground Foundation:  

  - The concrete foundation's load-bearing capacity must be 2 times the equipment's full-load weight.  

  - Levelness error 2mm/m.  

  - Use anti-vibration rubber pads (thickness 10mm) for screw compressors and spring dampers for piston compressors. Secure with anchor bolts (e.g., M16 bolt torque 80-100Nm).  

Vibration control is critical. After installation, use a leveling instrument with an accuracy of 0.02mm/m to check. Longitudinal and lateral deviations must be 0.5mm/m, and the elevation error for multiple units must be within ±3mm to avoid pipeline stress concentration.  

Pipelines and System  

The scientific layout of pipelines directly affects air pressure stability and energy consumption.

- Inlet Pipeline:  

  - Short, straight, and smooth.  

  - Pipe diameter should be larger than the equipment interface (e.g., if the interface is DN50, use DN65 pipes).  

  - Minimize bends (prefer 45° elbows).  

  - Pressure drop 0.01MPa.  

- Exhaust Pipeline:  

  - Slope toward the air storage tank (gradient 1:100) to prevent condensate backflow.  

  - Use high-pressure rubber asbestos gaskets (1.6MPa) for flange connections.  

  - For threaded connections, wrap with PTFE tape clockwise 3-5 times.  

The sequence of post-processing equipment must not be incorrect. The standard process should be:  

Air Compressor Aftercooler Moisture Separator Air Storage Tank Dryer Precision Filter.  

- Spacing between equipment 1.2 meters.  

- The dryer must be installed horizontally.  

- Precision filters must be installed vertically with the arrow aligned with the airflow direction.  

- The drain outlet should be higher than the downstream pipeline.  

Electrical safety is a baseline requirement:  

- Power voltage fluctuation ≤ ±10%.  

- Cables should be sized at 1.5 times the rated current (e.g., 35mm² copper cable for a 75kW motor).  

- Use a TN-S grounding system with grounding resistance 4Ω. Do not share with lightning protection grounding.  

- Control wires must be shielded and installed separately from power cables (spacing 300mm).  

- Keep sensors away from vibration sources (e.g., install pressure sensors on stable pipeline sections at least 10 meters away).  

Commissioning and Protection  

Five mandatory checks before startup:  

1. Lubricant level between 1/2 and 2/3 of the sight glass; belt sag 10-15mm.  

2. Remove all pipeline blind plates, plugs, and desiccant bags.  

3. Verify correct opening/closing of cooling water valves (for water-cooled models).  

4. Check if high-temperature components (>80°C) are equipped with protective covers.  

5. Install a safety valve (set pressure at 1.1 times working pressure) and a 1.6-grade pressure gauge on the air storage tank.  

Key parameters during trial operation:  

- Verify motor rotation direction during no-load startup.  

- Run for 30 minutes and measure vibration values (6.3mm/s for screw compressors, 11.2mm/s for piston compressors).  

- After loading, check:  

  - Exhaust temperature (100°C for oil-injected screw compressors).  

  - Pressure fluctuation (≤ ±0.02MPa).  

  - Use soapy water to check for leaks at pipeline connections.  

Mandatory safety requirements:

- Install protective railings 1.2 meters around the equipment.  

- Equip rotating parts with protective covers (mesh size 50mm × 50mm).  

- Emergency stop buttons must be red mushroom-head type, installed at a height of 1.5-1.8 meters, and connected to an independent hard-wired circuit.